• Guaranteed Fitment

    Always the correct part

  • In-House Experts

    We know our products

  • Added Value

    Expert installation available

  • Wordwide Delivery

    Delivery options for all

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

INDAEPS
Out of stock
Fuel Injectors - Diesel
$274.55
$274.55

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Your cart
Product Product subtotal Quantity Price Product subtotal
User 1
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
$274.55/ea
$0.00 $274.55/ea $0.00

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Read More
Read Less

SHIPPING

Holiday Shipping

Items that are out of stock or are shipping directly from the manufacturer are not guaranteed and will not have an ETA before Christmas. Guaranteed days left are based on FedEx Ground Shipping. Expedited shipping not included in calculation.

FREE SHIPPING

Free shipping is available within the lower 48 states for some product orders or Internationally for other product orders. Simply select the free shipping option during checkout. This offer may exclude shipments going to Alaska, Hawaii, Military Boxes, and items too large to ship via a standard carrier. These items are usually large freight or bulky items such as engine blocks, etc.

TURNAROUND TIME

The majority of orders containing items listed as “In Stock” will ship within 1-2 business days if placed on a weekday before 2PM MST / 4PM EST. Orders requiring additional verification (security concerns, incorrect information, etc.) may need additional processing time. Items listed as “On Order” or “Out of Stock” typically ship by the estimated ship date listed on the product page. These estimated dates are not guaranteed and are subject to change periodically. Our customer service representatives monitor backorders on a daily basis to ensure your order ships as soon as possible.

TRANSIT TIMES

The delivery time of your package primarily depends on the shipping carrier and the service level selected. When selecting the shipping method for your package, please keep in mind that most carriers do not work on weekends or major holidays. When carriers quote shipping days, they are referring to business days. Business days are defined as Monday through Friday, with the exception of holidays observed by the parcel carriers. As a general rule, transit times are as follows:

Next Day Air - Delivered within 1 Business Day
2nd Day Air - Delivered within 2 Business Days
3-Day Service - Delivered within 3 Business Days
Ground - Delivered within 3-5 Business Days

OUT-OF-STOCK ORDERS

If an order is placed for a product that is labeled “On Order” or “Out of Stock”, we will keep your order in our system and ship the item as soon as it becomes available. TruSpeed Performance reserves the right to split your order into multiple shipments without notification in an attempt to try and get your products to you sooner. Orders are normally only split automatically if both orders qualify for free shipping. If you wish to split your order voluntarily due to an out of stock item, please notify our customer service department and be aware that additional shipping charges may apply if both shipments do not qualify for free shipping.

INTERNATIONAL SHIPPING

TruSpeed Performance ships packages all over the globe. If you would like to see an estimated cost of shipping an item(s) internationally, simply add the desired item(s) to your Shopping Cart and use the "Calculate Shipping" feature. Please remember these shipping charges do not include any duties, customs charges, or brokerage fees that may accompany your shipment; all importation fees assessed by the shipping carrier, local or national governments are the buyer’s responsibility and will not be paid or reimbursed by TruSpeed Performance. By law, TruSpeed Performance is required to list all package contents at the actual purchase price. If a package is refused rather than pay any importation fees, TruSpeed Performance reserves the right to deduct the cost of the return shipment, including customs clearance charges, from your product refund or abandon the package with no refund when the cost of return shipping is more than the original order. For more information about international returns, please refer to our Return Policies page.

APO / PO BOX SHIPMENTS

Shipments going to an APO or PO Box will default to ship via USPS as the shipping carrier. Please be aware that the United States Postal Service (USPS) has size restrictions on shipments going to APO’s and PO Boxes. If you have a large item needing to ship to a postal box please contact one of our customer service representatives to look at available options. If you choose to have your APO or PO Box shipment sent via a different carrier, we suggest verifying the delivery possibilities with that carrier before placing the order. If a package is deemed undeliverable by a carrier that cannot delivered parcels to your post office box or APO the buyer will be responsible for all freight charges and fees associated with the shipment.

BILLING / SHIPPING ADDRESSES

If you wish to have your item(s) shipped to an address other than your billing address, please be aware that your order may require additional verification and may be subject to processing delays. We recommend allowing extra time for order fulfillment when shipping to an alternate address. If you have any questions about your order verification please feel free to contact our customer service department.

DAMAGED / LOST SHIPMENT

If your shipment becomes damaged or lost in transit, please notify one of our customer service representatives immediately. Do not discard any boxes or packaging materials that were included with the shipment. In order to fully process a damage claim, all original products and packaging materials must be provided. TruSpeed Performance is not liable for damage claims that are denied due to customer negligence.


RETURNS

HOW TO RETURN AN ITEM:

Once you have read through the return policies, please visit the My Account section of the website. Once there please see the Shipped Orders section to start the RMA process.

TSP GUARANTEE - 30 Days, 100% Satisfaction

Items covered under the TSP Guarantee offer a 30 day no questions asked return policy. TSP Guarantee items may be returned within 30 days of the original invoice date and must include all the original parts and contents for a refund. This guarantee does not apply to products that have been modified, damaged, misused or abused. All returns require an RMA (Return Merchandise Authorization) Number, and freight charges are strictly non-refundable. For more information regarding our freight refund policy, please refer to the Product Refunds section below.

*Products purchased in a kit/combo are only eligible for return if the ENTIRE KIT/COMBO is returned at the same time. Individual items inside a kit/combo cannot be returned separately.

STANDARD RETURN POLICY - 30 Days

Unless another return policy is indicated, products sold by TruSpeed Performance are covered by this Standard Return Policy and may be returned within 30 days of the original invoice date for a refund. All returns require an RMA (Return Merchandise Authorization) Number, and freight charges are strictly non-refundable. For more information regarding our freight refund policy, please refer to the Product Refunds section below. Due to the dangerous and stressful nature of racing and performance vehicles, no returns will be accepted on opened, installed, or otherwise used products. Failure to comply with the terms stated herein, as well as those stated on the RMA form, may result in delayed return processing and/or refusal of returned packages. Items that were shipped incorrectly, have been damaged in transit, or which require warranty repair or replacement are not covered by our Standard Return Policy and must be reviewed by a member of our customer service department.

*Products purchased in a kit/combo are only eligible for return if the ENTIRE KIT/COMBO is returned at the same time.  Individual items inside a kit/combo cannot be returned separately.   

 

NON RETURNABLE - Clearance Items, Special Orders, Open Box / Overstock

TruSpeed Performance often sells items that are not eligible for return. These items are labeled as Open-Box, Clearance or Overstock merchandise. These items are sold at greatly-reduced prices, therefore all sales are considered final and no returns or refunds will be granted. The buyer assumes responsibility for any and all risks that may be associated with purchasing said items. While items have been tested for basic functionality, they may have superficial physical defects including (but not limited to) scratches, dings, or dents. Should any items prove defective in either quality or performance after the sale is complete, the buyer assumes responsibility for the cost of all necessary servicing or repairs and agrees to absolve both TruSpeed Performance and the manufacturer from any and all responsibility, unless otherwise required by law. Open-Box, Clearance and Overstocked items are not covered by any type of 30-day warranty or satisfaction guarantee.

TruSpeed Performance also sells unique or custom order items that are often times made to order and/or are considered special order items. These items are ordered in on a case by case basis. Consequently items indicated as having this Special Order Return Policy are not eligible for returns or exchanges. Special order items require a minimum of a 50% non-refundable deposit. This deposit will not be refunded if the order is cancelled unless the items that were ordered are unattainable from the manufacturer. The buyer assumes responsibility that the items ordered will fit their needs.

GIFTCARD

Gift Cards cannot be returned and may not be redeemed for cash. TruSpeed Performance Gift Cards are issued and managed by TruSpeed Performance and can only be applied to purchases from TruSpeedPerformance.com, or the local TruSpeed Performance storefront. TruSpeed Performance is not responsible for gift cards that are lost, stolen, or used without permission. Additional payment will be required if the purchase price of a new order/product exceeds the value of the Gift Card. Gift Cards are not for resale. Void where prohibited or restricted by law. Gift Card terms and conditions are subject to change without notice. Use of a Gift Card is governed by the laws of the State of Utah. 

REFUSED / UNDELIVERABLE ORDERS

Refused or undeliverable orders that are returned to our facility will be processed like a standard return; this means all shipping costs, including return freight charges and any return-to-sender fees assessed by the shipping carrier, will be deducted from the product refund. Keep in mind that international orders which have been refused by the receiver or deemed undeliverable by the shipping carrier may be subject to duties, taxes, customs charges or brokerage fees on the return shipment. TruSpeed Performance reserves the right to deduct these additional costs, in addition to all freight charges, from the product refund. If you would like to return an item it is recommended that all shipments be accepted and then sent back following our standard return process. Refusing a package has the potential to have it refused, cause delays in return shipping as well as incur additional shipping charges.

PRODUCT REFUNDS

Once your return shipment has been received and approved, a refund will be processed and a credit will automatically be applied to the original form of payment. The refund will most likely appear on your credit statement within 1-5 business days, depending on your bank's processing practices. Please keep in mind that only returns which meet all RMA conditions and return policy requirements will be eligible for a refund. TruSpeed Performance does not refund shipping charges for returned items, and orders which qualified for our Free Shipping Promotion will not receive a refund for the credited shipping charges. Any customs or duties charges incurred upon returning an international shipment will be charged to the original form of payment. Refused or undeliverable orders may also be subject to return freight fees, duties, taxes, customs charges or brokerage fees. If you have any questions regarding the refund process, please contact one of our customer service representatives.

PRODUCT WARRANTIES

TruSpeed Performance does not offer any type of warranty coverage for defective products. However, the majority of the products available through our website are covered separately under a manufacturer's warranty. If you recently purchased a product from TruSpeedPerformance.com and are concerned about the fitment or performance of your item, please contact a member of our customer service department for assistance. Our customer service representatives can provide installation support, troubleshooting advice, and assistance identifying the possibility of any manufacturer defects. If we suspect your product does have serious defects, our customer service department can serve as a contact with the manufacturer to help arrange a warranty inspection and, if applicable, any necessary repairs or replacement shipments. If you wish, you may also contact the manufacturer directly for information regarding product eligibility and specific terms and conditions of warranty coverage.


Conditions of Use

By visiting or purchasing from TruSpeedPerformance.com, you agree to abide by our terms and conditions, including those set forth on this page. Any revisions to our Return Policies will be posted on this page and any other page we deem necessary to inform our users of any changes made. We reserve the right to modify our Return Policies at anytime. Your continued use of the Site following any policy revisions constitutes your acceptance of and agreement with the changes made.

Yes it is.

Please make sure that you follow below steps:

1/ Download the package from themeforest.net (the file is in zip format)

2/ Extract the file you've just downloaded.

3/ Find this file: ella-3.0.0-sections-ready.zip in the folder Ella Sections Ready 3.0.0, then you just need to upload ella-3.0.0-sections-ready.zip file to your Shopify store.

To save your time and reach our support quickly, please follow below steps:

1/ Create a staff account for us (with Themes permission and Settings permission) http://docs.shopify.com/manual/settings/account/staff-members

2/ Capture screenshot or video for the issue you get.

3/ Specify which template and version you are using.

4/ Describe clearly how to reproduce the issue.

5/ Send all information (staff account, screenshot, video, template name and version, description of the issues, link) to email@domain.com

Yes, we will assist you to install the template if needed

Yes, we do. Please send your customisation requests to email@domain.com, we will give you our quote. Thank you.

Yes. You can turn on/off the animation in the Setting page.

Yes. You can turn on/off almost any blocks on the page (featured products, slideshow, banners, related products, recent products,...).

Yes, we have a setting for you to switch between these two options: Display on Hover and Display on Click.

The theme package includes theme source, Photoshop design files, sample data and manual guide.

That is not a problem. You just need to modify the width/height ratio in theme settings.

We use cookies to improve your experience on our website. Read about how we use cookies in our Privacy Policy. By browsing this website, you agree to our use of cookies. privacy policy
accept

Your cart

×